
Textile & Engineering Institute2020 · COMPLETED
Sasmira College of Textile and Engineering
Worli, Mumbai · Mumbai City, Maharashtra1,00,000 SFT (1 Lac SFT)CLIENT: Sasmira Trust
ENGINEERING OVERVIEW
Project Overview
High-density urban institutional construction for the renowned SASMIRA (Synthetic & Art Silk Mills' Research Association) campus in Worli, Mumbai. Required careful execution within an active metropolitan educational environment, adhering to stringent noise, vibration, and municipal safety regulations.
Scope of Work Delivered
Urban Structural Upgradation & Heavy Civil Construction
Specialized Textile Machinery Heavy Concrete Beds
High-Capacity Industrial Power Sub-Distribution & Cable Trenching
Facade Modernization & Precision Exterior Architecture
Fire-Life Safety Hydrant Network Overhaul
Construction Highlights & Assurance
Complex heavy-machinery structural foundations with anti-vibration neoprene dampening
Zero disruption to active adjacent academic wings during high-intensity civil works
High-specification industrial flooring with abrasion-resistant hardeners
Completed with appreciation from SASMIRA Trust governing board
PROJECT DOSSIER
Engineering Specifications
CLIENT / ORGANISATION:Sasmira Trust
LOCATION:Worli, Mumbai
GROSS BUILT AREA:1,00,000 SFT (1 Lac SFT)
COMPLETION YEAR:2020
ARCHITECT:Master & Associates Ford
GEOGRAPHIC COORDS:19.0028° N, 72.8175° E
SAFETY RECORD:Zero Lost Time Accidents (LTA)
ARCHITECTURAL DOCUMENTATION
VERIFIED JOB-SITE IMAGERYProject Gallery & Construction Views

VIEW 01

VIEW 02

VIEW 03

VIEW 04

VIEW 05

VIEW 06


